Center shelf/panel fabricated and fitted. Will stain to match remainder. I have completed two panel doors for the openings. Am fitting an LCD clock to the one on the right. Next step is to mount tv then fabricate a piece of trim to hide remaining wires.
Test fit of the smart tv. I needed to lower it and take off the angle. This required cutting the original bracket arms and pop riveting on new ones made from aluminium bracket (with some epoxy back-up). This meant I could use the original screw holes in the wall. Came out exactly as I wanted.
You sure ended-up with a ton of wiring there.
Molly has Angel Eyes! The Inuit tribal dog the M'lute also had Angel Eyes, and one of their three jobs was to protect the kids against other animals, and through those eyes they kept watch 24 hours per day. My dog Grace is an M'lute:
__________________
2019 Minnie Winnie 22M on an E-450 frame
Project completed. Very happy with the results. I've included a picture of a stock Sunstar 27PE to show what mine looked like when I purchased new last year.