The first thing to fix is the roof. The area over the lounge had two florescent lights, and that design compromised the strength, so the roof pulled away from the top channel, and began to leak.
Here is a photo after removing the fiberglass (the new front panel is already installed)
Here is the panel under construction:
And an inside view of it installed:
Here is a photo after removing the fiberglass (the new front panel is already installed)
Here is the panel under construction:
And an inside view of it installed: